OFITECO to draft the project for the new connection link between TO‑23 and TO‑22 on the A‑40 highway

The Directorate‑General for Highways formalised the commission for the drafting of the alignment and construction project for the new connection link between the TO‑23 and TO‑22 roads, located along the A‑40 Highway corridor between Toledo and Ocaña. This is a strategic intervention aimed at improving accessibility and functional continuity along this key route in the […]
OFITECO to prepare the improvement project for the A‑1 highway between San Agustín de Guadalix and El Molar

The Directorate‑General for Highways commissions OFITECO, in Temporal Joint Venture, the drafting of the alignment and construction project to modernise the A‑1 Highway, in the section between the San Agustín de Guadalix North Interchange and the El Molar Bypass. This is a key intervention along a corridor with high traffic volumes and clear needs in […]
OFITECO responsible for updating the A‑12 highway project in Burgos

OFITECO is updating the Construction Project for the A‑12 Highway, the Camino de Santiago route, in the section between Villamayor del Río and Villafranca Montes de Oca. The initiative, promoted by the Directorate‑General for Highways adapts the previously approved project to new technical, regulatory, and environmental requirements, ensuring the infrastructure meets current traffic demands and […]
The General Directorate of Roads has put into service the Torreperogil – Villacarrillo section of the A-32 Linares-Albacete Highway, where OFITECO has carried out the control and surveillance work.

On September 23, the 13.6-kilometer Torreperogil-Villacarrillo section connecting the Úbeda-Torreperogil section with the Villacarrillo-Villanueva del Arzobispo section was opened to traffic. In September 2018, the General Directorate of Roads and OFITECO formalized the contract for the control and supervision of the works. During this time, OFITECO has ensured compliance with the contract conditions and guaranteed […]
OFITECO and the General Directorate of Roads formalize the contract for the control and supervision of the remodeling works on the junction between the E-15/A-7 Mediterranean Highway and the A-92 Highway in Viator (Almería).

The contract is valued at €900,095.93 (VAT excluded) and will be executed over a period of 39 months. Currently, the connection between the A-7 and A-92 motorways is via a diamond-shaped interchange with a lower roundabout of 116 m outside diameter, which also receives traffic from the A-1000 motorway (North Access to Almería) and the […]
OFITECO will support the General Directorate of Highways in the control and supervision of the “Completion of the N-332 road works. Benissa diversion”. Province of Alicante.

OFITECO offers its highly specialised services in control and supervision of road works, for the “Completion of the Benissa diversion works”, in Alicante, with a length of 4,681 m. The General Directorate of Highways has entrusted OFITECO with the supervision of the N-332 road completion works in its Benissa diversion. The main aim of this alternative […]
The General Directorate of Highways attached to the Ministry of Public Works and Transport has selected OFITECO to carry out control and surveillance works for the “El Musel port access motorway “

The award of this contract strengthens the trust of General Directorate of Highways places in the experience and good work of OFITECO concerning quality control and surveillance of works. OFITECO has been selected by the General Directorate of Highways attached to the Ministry of Public Works and Transport for carrying out control and surveillance works […]